Location: St. Petersburg, FL
Brand: Spectra Contract Flooring Tampa
General Contractor: Terbo Construction
Supporting an Active Healthcare Environment
At St. Anthony’s Hospital in St. Petersburg, Florida, Spectra Contract Flooring Tampa partnered with Terbo Construction on a phased commercial flooring installation spanning the hospital lobby and PET/CT space.
With the hospital remaining open and operational throughout the project, the work was carefully coordinated across four phases to help minimize disruption to patients, visitors, staff, and day-to-day hospital operations. This phased approach allowed the project to move forward while St. Anthony’s continued serving the community.
Building from the Floor Up
Another challenge was waiting beneath the existing flooring. The hospital’s older concrete substrate required extensive preparation and self-leveling before the new flooring could be installed.
The Spectra team used MAPEI patching and self-leveling products to create the appropriate foundation, followed by MAPEI adhesives during installation. The flooring scope included Armstrong LVT, Daltile ceramic tile, and Johnsonite Millwork Base, bringing durable new surfaces to the lobby and PET/CT areas.
Bringing the Project Together
The completed flooring helps create a welcoming, updated environment for patients, visitors, and staff while providing the durability needed to stand up to the daily traffic of a busy healthcare facility. From the lobby that welcomes people into St. Anthony’s to the PET/CT space supporting patient care, the project enhances spaces that play an important role in serving the St. Petersburg community.
And the work at St. Anthony’s is continuing. Spectra Contract Flooring Tampa is now getting started on a second, adjacent flooring project, building on the work completed through this first project.



